A 1960s/70s detached in Epsom, mid‑way through a full owner renovation. Strip‑out exposed significant damage at the front‑left corner and the garage's internal wall. A defective drain ran right through the middle of the garage. Thirteen resin injection points, treating to 3m, completed in one day before the renovation moved on.

A 1960s/70s detached in Epsom, mid‑way through a full owner renovation. Strip‑out exposed significant damage at the front‑left corner and the garage's internal wall. A defective drain ran right through the middle of the garage. Thirteen resin injection points, treating to 3m, completed in one day before the renovation moved on.
A substantial two‑storey 1960s/70s detached house in Epsom, Surrey, under full owner renovation. During strip‑out the team found significant damage to the external wall on the left‑hand side of the property and the internal right‑hand wall of the garage. The customer wanted the subsidence corrected before any further renovation works. On site we ran a 360‑degree scan, took photos, carried out a dynamic cone penetrometer test and a drainage survey. Soils were soft, firming up at 2.6m, confirmed against the British Geological Survey data. The footing was a 1000mm deep strip foundation. A drain survey the owner had already commissioned was confirmed on our check — the drain running through the centre of the garage had several major defects and a small amount of root ingress, feeding water into the soil right under the affected corner.
Mid‑renovation and self‑funded — the owner wanted the ground sorted before the next wave of trades came in, so the stabilisation had to be scoped, designed and delivered on a programme that didn't hold the rest of the work up. Standard buried‑utilities risk aside, nothing else on site.
Ground improvement treatment to the front left corner of the property, taken down to 3m below ground level — the deepest treatment in our recent run. Thirteen injection locations around the corner, treating at three depths — 1.2m, 2m and 3m — with polyurethane rigid foam resin to firm up the softened column under the strip footing.
Completed in a single day. Injection points repaired, no mess left on site, and the owner stayed in the property while we worked. Post‑works dynamic cone penetrometer testing confirmed the ground had been stabilised, clearing the way for the renovation to move on and the cosmetic repair to begin.
Resin injection vs underpinningTell us what you're seeing. We'll book a same‑week survey, produce a written engineering report, and quote in plain numbers.