A substantial detached house on the outskirts of Twickenham was being brought back from disrepair by a developer. De‑vegetation and strip‑out exposed extensive cracking across the elevations. Stabilised with 24 resin injection points over two days, with the renovation programme carrying on through.

A substantial detached house on the outskirts of Twickenham was being brought back from disrepair by a developer. De‑vegetation and strip‑out exposed extensive cracking across the elevations. Stabilised with 24 resin injection points over two days, with the renovation programme carrying on through.
A substantial two‑storey detached property on the outskirts of Twickenham, previously derelict and heavily overgrown, now under a full renovation by a developer. During de‑vegetation and strip‑out the team uncovered extensive cracking around the external walls — including historic brick‑stitching repairs — and called us in. On site we ran a 360‑degree scan, took photos, carried out a dynamic cone penetrometer test and reviewed the drainage. Soils were loose, firming up at around 2.0m, confirmed against the British Geological Survey data. A drainage survey the developer had already commissioned showed significant defects in the drains around the property, letting water into the ground beneath the walls that were moving.
A live renovation site. The developer's programme couldn't stall — stabilisation had to be scoped, designed and executed so the strip‑out and fit‑out crews could keep moving, with no significant risks identified beyond the standard buried‑utilities check.
Ground improvement treatment across the majority of the external walls, to 2.6m below ground level. Twenty‑four injection locations around the structure, treating at three depths — 0.9m, 1.6m and 2.6m — with polyurethane rigid foam resin to firm up the softened soil column under the footings.
Completed in two days. Injection points repaired, site left safe, no mess left behind, and the renovation works carried on without delay. Post‑works dynamic cone penetrometer testing confirmed the ground had been stabilised, clearing the way for the cosmetic repair of the brickwork.
Resin injection vs underpinningTell us what you're seeing. We'll book a same‑week survey, produce a written engineering report, and quote in plain numbers.